The New Tappan Zee Bridge
Featuring a twin 1,200-foot cable-stayed main-span, LARSA 4D's Steel Bridge Module is the designated tool for the 350-foot steel-girder approach spans of The New Tappan Zee Bridge in Tarrytown, New York. This Accelerated Design-Build project is scheduled to be completed in early 2018.
Project Details
- Client:HDR Engineering
- Location: Tarrytown, New York
- Date: Est. 2018
- Design Type: Curved Steel Girder Approach Ramps